Our team was engaged by a well-established local golf course to upgrade several of its bunkers using our advanced rubberised bunker lining solution. The course had been experiencing ongoing issues with sand contamination, poor drainage, and bunker bases breaking down under regular play, resulting in increased maintenance demands and inconsistent playability. The objective of the project was to deliver a long-term solution that improved bunker performance and drainage while protecting the surrounding course. All works needed to be completed with no damage to the turf or playing surfaces and minimal disruption to golfers. Swipe for more The project involved the installation of our specialist rubberised bunker lining system, designed to enhance durability and reduce ongoing maintenance. Key elements of the works included: Careful Bunker Preparation: Existing sand was removed and retained where possible, and the bunker bases were prepared to receive the liner without disturbing surrounding turf or drainage infrastructure. Rubberised Bunker Lining Installation: The bunker bases and faces were lined with a permeable rubber system, forming a durable barrier that prevents contamination from underlying soils while maintaining the traditional appearance of the bunkers. Improved Drainage Performance: The open-textured rubber lining allows water to pass freely through the bunker profile, enabling rapid drainage and reducing the risk of standing water after heavy rainfall. Resistance to Wear and Impact: The flexible yet robust lining resists damage from deep club strikes and helps prevent sand movement and wash-down, ensuring consistent bunker conditions over time. Sustainability was a key advantage of the chosen bunker lining solution: Reduced Material Waste: By preventing contamination from below, the rubberised liner significantly extends the lifespan of bunker sand, reducing the frequency of sand replacement and disposal. Lower Maintenance Requirements: Improved drainage and structural stability reduce the need for repeated repairs, reshaping, and mechanical intervention, resulting in lower fuel usage and reduced labour demands. Efficient Water Management: Faster drainage minimises water retention in bunkers, helping the course recover more quickly after rainfall and reducing reliance on remedial works that can impact surrounding turf and ecosystems. Long-Lasting Solution: The durability of the rubber lining means fewer future interventions, supporting a more sustainable, low-impact approach to bunker management over the long term. Protecting the Course: All access routes, materials handling, and installation methods were carefully planned to ensure zero damage to fairways, greens, and surrounding turf. Working Within an Active Golf Environment: The works were programmed around play to minimise disruption while maintaining high standards of workmanship and safety. Performance Under Play: The selected lining system was specified to cope with frequent play and deep swings, ensuring consistent performance without compromising bunker aesthetics. The completed project has delivered a durable, high-performance bunker solution that improves playability, drainage, and long-term sustainability. The golf course now benefits from bunkers that remain consistent in all weather conditions, require less ongoing maintenance, and retain their quality for longer. The client was extremely pleased with both the finished result and the care taken to protect the course throughout the works. The rubberised bunker lining provides a future-proof, environmentally conscious solution that will serve the course and its members for many years to come. Rubberised Bunker Lining Installation at Local Golf Course
The Brief





![]()
Key features
Sustainability Benefits
Obstacles and Solutions
Want to find out about how we work?

Conclusion



